Type and Press enter

Proud to deliver excellence in Project Cargo Logistics!

Goldair Cargo S.A. has successfully completed the safe transport and on-site delivery of a massive 175-ton power transformer, along with 5 oil storage tanks and all heavy accessories, for SUNEL Group in Kozani, Greece.

Moving heavy and oversized equipment requires flawless precision and planning. Exiting the Port of Thessaloniki, our specialized project team executed:

Comprehensive route surveys and bridge engineering assessments.

Full coordination with Greek authorities, police escorts, and railway operators (OSE).

Dedicated multi-axle heavy-haul transport and expert on-site offloading.

Every strict safety standard and technical protocol was rigorously maintained from port handling all the way to foundation delivery at the jobsite.

A sincere thank you to CHINT for once again placing their trust in Goldair Cargo for this critical milestone, and to Sunel Energy for the seamless cooperation throughout the operation.

Another demanding heavy-lift mission accomplished!